久久久久久a|尺度大的美剧未删减电影完整|天堂中文av|91色欧美,甜蜜人生在线观看电视剧免费完整版国语版 ,长月烬明电视剧在线观看,彗星撞地球电影完整版在线观看

軟題庫 培訓(xùn)課程
試卷年份2009年上半年
試題題型【單選題】
試題內(nèi)容

Many of the activities performed during the preliminary investigation are still being conducted in(1 ), but in much greater depth than before. During this phase, the analyst must become  fully aware of the(2 ) and must develop enough knowledge about the(3 ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4 ) for process and data of current system, the deliverable from this phase also includes the(5 ) for the proposed system.
(1)A. analysis phase
B.  design phase
C.  implementation phase
D. maintenance phase
(2)A. main symptom
B.  root problem
C.  final blueprint
D.  data specification
(3)A. hardware environment
B. testing environment
C. software environment
D. business environment
(4)A. logical models
B. physical models
C. design models
D. implementation models
(5)A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. general problem statement

查看答案

相關(guān)試題